The incident beam, produced, conditioned, and defined before the sample. The controllers that drive these devices are on the Controls page. Each device pairs its human name with its control handle, its key specs, and whether it is field replaceable. new marks a device not yet modeled in CORA; confirm marks a value taken from the docs that staff have not yet verified.

Generated from the descriptor

This page is generated from the descriptor at deployments/syrmep/beamline.yaml. Edit the descriptor, not this page.

Property Value
Facility elettra
Sector SYRMEP
Tier Unit
Source bending-magnet (confirm: first bending magnet of section 6; at 2.4 GeV critical energy 5.59 keV, field 1.45 T (SRC-1))

Machine

The machine-level source state, observed not driven.

Enclosure: syrmep-optics.

Note

The Elettra storage-ring state, the loose StorageRing pattern reused across the fleet (MACHINE-1).

Name Family PV Key specs Replaceable Status
StorageRing StorageRing confirm: Elettra storage-ring state (2.0 GeV / 300 mA and 2.4 GeV modes; current, fill); observe-only, exact Tango handles are MACHINE-1 Elettra storage-ring state; observe-only (MACHINE-1) new confirm

Source

Where the bending-magnet beam enters and first gets gated.

Enclosure: syrmep-optics.

Note

The source devices are a flat set on the SYRMEP Unit (the 2-BM precedent): the bending-magnet beam is a Supply (PhotonBeam), provenance only; the safety shutter and beam-defining mask gate it. No Conditioner Assembly earns its place at this stage.

Name Family PV Key specs Replaceable Status
source Beam bending magnet (first BM of section 6), recorded as a Supply, not an Asset (SRC-1) new
FrontEndShutter Shutter confirm: the front-end / safety shutter gated by the Elettra PSS; handle not in public source (PSS-1) front-end safety shutter, gated by the personnel safety system (PSS-1) new confirm
BeamDefiningMask Mask passive
the fixed white-beam-defining aperture upstream of the optics; dimensions and drawing not in public source (OPT-1)
new confirm

Conditioning optics

Pick the beam energy (or pass white beam), shape it, and filter it.

Enclosure: syrmep-optics.

Note

The double-crystal Si(111) monochromator binds Monochromator; the mono / white beam choice is a per-Asset setting on it (the 2-BM DMM insert/retract precedent). The incident energy is a PseudoAxis over the DCM. The laminar-beam slits bind Slit and the filters bind Filter.

Name Family PV Key specs Replaceable Status
Monochromator Monochromator confirm: double-crystal Si(111) DCM, fixed-exit Bragg geometry (20 mm vertical offset); Bragg / offset handles not in public source (MONO-1) crystal: Si(111)
energy range mono: 10-40 keV (EPJ Plus 2024 review; the elettra.eu spec still lists 9-40, MONO-1)
beam modes: monochromatic, white
the double-crystal Si(111) monochromator (fixed-exit, 20 mm offset). The white / pink beam mode (~16-30 keV average) bypasses the crystals; modeled as the Monochromator Asset beam-mode setting (the 2-BM dmm_insertion precedent). Energy range 10-40 keV mono per the 2024 review; the official spec page still lists 9-40 keV (MONO-1).
new confirm
BeamEnergy PseudoAxis confirm: incident-energy pseudo-axis over the DCM Bragg arms; partition rule and handles are MONO-1 incident-energy pseudo-axis (the 2-BM energy-curve precedent); range and rule are MONO-1 new confirm
BeamSlit Slit confirm: the white-beam-defining slits shaping the laminar beam (~120-160 x 4-5 mm at 20-23 m); blade-axis map and handles are OPT-2 water cooled
white beam
the laminar-beam-defining slits; the 7 mrad horizontal acceptance gives a ~120-160 mm wide, ~4-5 mm tall beam (OPT-2)
new confirm
Filter Filter confirm: the beam-hardening / attenuation filter set; foils and handles not in public source (FOIL-1) the absorption / beam-hardening filters; foil materials and the selector handle are FOIL-1 new confirm