What CORA needs the PDF team to confirm. This model is reverse-engineered from public open source (the NSLS2/pdf-profile-collection profile collection and the NSLS2/pdftools device library): the EPICS PVs are read from them, but vendor identities, physical positions, and the detector geometry are not. Each row is a fact the beamline team owns. It is a delete-on-answer queue.

Priorities: Blocks-build, Blocks-go-live, Nice-to-have.

Source and safety

ID Priority Question CORA assumes Resolves
SRC-1 Nice-to-have The 28-ID source identity and parameters. No source PV is in the profile collection; CORA infers the shared 28-ID damping wiggler from facility knowledge. An insertion device, the shared damping wiggler, identity-only. The InsertionDevice settings.
PSS-1 Blocks-go-live The PSS search-and-secure permit-leaf PVs. Only the fast and photon shutters are in source. The permit signal is a confirm note, not a guessed PV. The Enclosure permit signals.
MACHINE-1 Nice-to-have The storage-ring state PDF reads (current, fill, status). Observe-only machine state, a loose StorageRing; the exact PVs beyond ring_current pending. The machine-state observation.
GOV-1 Nice-to-have The NSLS-II operator pool and safety-review structure (site-level, shared across the beamlines). Carried pending on the NSLS-II Site, not instantiated per beamline. The governance principals.

Optics

ID Priority Question CORA assumes Resolves
MONO-1 Nice-to-have The side-bounce monochromator crystal cut, reflection, and energy range. The device (Mono:SBM) is confirmed. A single high-energy Laue Monochromator Asset; cut and range blank. The Monochromator settings.
ENERGY-1 Nice-to-have Is PDF always fixed-energy per experiment, or does any routine scan energy as the measurement? Fixed-energy; energy scan deferred. The energy Capability decision.

Sample and environment

ID Priority Question CORA assumes Resolves
STAGE-1 Blocks-go-live The full spinner and analyzer goniohead axis set, and whether the sample orientation warrants a Goniometer plus an Assembly (the i11 precedent). A Goniometer spinner; the analyzer noted, the Assembly deferred. The sample-stage modelling.
TEMP-1 Nice-to-have Which thermal units are live (the cs800 cryostream make, the Lakeshore cryostat, the Linkam furnace) and their ranges. One thermal-environment TemperatureController Asset; units blank. The sample-environment roster.
ENV-1 Nice-to-have The gas-handling and humidity rig (flow valves, residual-gas analyzer, humidity) is present in source but not modelled. Does it warrant a settable actuator Asset (the loose FlowController family)? Deferred; the thermal cluster is modelled, the gas / humidity rig noted. The in-situ environment modelling.

Detectors

ID Priority Question CORA assumes Resolves
DET-1 Blocks-go-live Which detectors are live (the two PerkinElmer panels, the Pilatus) and which serves which role. Both Cameras; PerkinElmer primary; Pilatus alongside. The detector roster.
DIST-1 Blocks-go-live The two-detector / two-distance geometry: the near and far distances, which tower is static vs moving, and how the panels merge for the PDF Q-range (the TwoDetectors plan). Two LinearStage towers; the merge deferred. The detector geometry and Q-range.
DIAG-1 Nice-to-have The background-photodiode / flux channel detail. A read-only FluxMonitor probe; channel map blank. The FluxMonitor binding.

Controls and technique scope

ID Priority Question CORA assumes Resolves
DRIVE-1 Blocks-go-live The motion-controller box models, firmware, IPs behind the EPICS motor records. One MotionController family bound (EndstationMotionController), specifics blank. The MotionController Models.
TECH-1 Blocks-go-live Do the total-scattering and powder-diffraction Methods enter CORA's catalog, or stay deferred? This is the same owner-scope decision Diamond i11 / i15-1 and XPD opened. Methods deferred (rendered unlinked), no Practice recorded. The powder / PDF Method scope.