Source¶
The incident beam, produced, conditioned, and defined before the sample. The controllers that drive these devices are on the Controls page. Each device pairs its human name with its control handle, its key specs, and whether it is field replaceable. new marks a device not yet modeled in CORA; confirm marks a value taken from the docs that staff have not yet verified.
Generated from the descriptor
This page is generated from the descriptor at deployments/p11/beamline.yaml. Edit the descriptor, not this page.
| Property | Value |
|---|---|
| Facility | petra-iii |
| Sector | P11 |
| Tier | Unit |
| Source | insertion-device (confirm: P11 is an undulator beamline for macromolecular crystallography and bio-imaging; the OnlineXML exposes no undulator device (it sits on the single haspp11oh host with the beamline motors), so the source is carried pending (SRC-1)) |
Source¶
The P11 optics hutch: the beam-conditioning motions on the oh and granite motor banks. The monochromator, mirrors, and slits are not individually labelled in the registry, so they are grouped as the optics-hutch positioning stages.
Enclosure: p11-oh.
Note
Handles read from p11/motor/oh. and p11/motor/granite.. The optics breakdown (monochromator, mirrors, slits) is OPT-1; the granite bank is the optics support / table stage.
| Name | Family | PV | Key specs | Replaceable | Status |
|---|---|---|---|---|---|
OpticsStages |
LinearStage |
bank: p11/motor/oh.01 |
the optics-hutch motor bank (oh_mot01..32 on p11/motor/oh.*): monochromator, mirror, and slit motions, per-axis roles not labelled, grouped as one stage carrying the bank prefix (OPT-1, GROUP-1) | new confirm |
|
GraniteStage |
LinearStage |
bank: p11/motor/granite.01 |
the granite support / table bank (granite_mot01..05 on p11/motor/granite.*); the optics or experiment granite base, role pending (GROUP-1) | new confirm |