What CORA needs the 32-ID team to confirm before the model can be trusted.

32-ID is a design-phase scaffold built from the published 32-ID docs, which mix pre-APS-U and current values, so almost every value on the device pages is carried as a fact still to confirm. Each row below is a fact the beamline team owns, not a CORA modelling choice (those are recorded on Model instead). It is a delete-on-answer queue: when an item is answered, the answer lands in the descriptor and the row is removed, with the reason in the commit. Priorities are Blocks-build (the answer changes the structure of the model, so CORA cannot finalize the shape without it), Blocks-go-live (a placeholder is fine for the description, but the real value is needed before CORA observes or drives the hardware), and Nice-to-have.

Topology and scope

The one structural unknown: how the canted source and its branches map onto CORA's Asset model. The answer decides whether 32-ID is one root Asset or two.

ID Priority Question CORA assumes Resolves
TOPO-1 Blocks-build 32-ID is canted: two undulators feeding two branches. Do 32-ID-B and 32-ID-C run off separate beams (two canted branches), and does the 32-ID-A optics set (mask, slits, monochromator, mode shutter) serve both branches or is it duplicated per branch? Which undulator feeds which branch? One root Unit Asset 32-ID with one optics train; the branch multiplicity is unmodelled pending this answer. One-vs-two root Assets and one-vs-two beam walks in the descriptor.

Control and safety

ID Priority Question CORA assumes Resolves
CTRL-1 Blocks-go-live What are the EPICS PV handles (and drive crates / IOC hosts) for each modelled device? Control handles are unassigned; CORA leaves each device handle empty. Wiring each Asset to a real control handle.
PSS-1 Blocks-go-live What are the PSS search-and-secure permit signals for the three hutches (32-ID-A, -B, -C)? Three hutches exist with permit signals to be named. The Enclosure permit signals.
BLEPS-1 Nice-to-have Are the BLEPS (equipment-protection) fault and status signals readable as PVs for an external observer, and which map to a utility versus a specific device? CORA observes outcomes only; it never models the interlock logic. Utility faults map to Supply status, device faults to an Asset condition; the matrix is not modelled. The Supply and Asset condition mapping.

Sources and optics

ID Priority Question CORA assumes Resolves
SRC-1 Blocks-go-live The exact device types and parameters of the two canted undulators (the source table lists "Planar 1.35" downstream and "Planar 2.8" upstream; a "U33" tuning curve is published). How do these labels relate, and what are the periods and gaps? Two InsertionDevice Assets, downstream and upstream, planar; periods and the U33 relationship unconfirmed. The insertion-device specs.
SRC-2 Nice-to-have The fixed front-end mask aperture and position, and the front-end window stack (count, material, thickness). A beam-defining Mask near 24 m and a Window (Be assumed); sizes unconfirmed. The front-end mask and window specs.
MONO-1 Blocks-go-live The Si(111) monochromator detail: per-axis motors, energy range over the 7 to 40 keV span, and whether it drives from a saved per-energy table. One Monochromator Asset, Si(111), 7 to 40 keV; axes and saved positions unconfirmed. The monochromator axes and energy model.
MODE-1 Blocks-build The white-beam to monochromatic switch (the P4-50 mode shutter with its white-beam stop and combined mono stops). Is this a per-branch hard split (one branch always white, one always mono) or a switchable mode on one optics set, and what is the switching sequence and interlock? A ModeShutter plus beam stops; switching is a coordinated, interlocked move, structure tied to TOPO-1. The beam-mode model (and whether it is a new Capability or an energy_change extension, decided on Model).
LAYOUT-1 Nice-to-have A single z-coordinate reference for the layout. The published docs give per-hutch positions but no common origin. z values are carried as approximate from-source and flagged confirm. Exact device z positions.

TXM endstation

ID Priority Question CORA assumes Resolves
TXM-1 Blocks-go-live Is the published TXM component list current post-APS-U, or does it carry pre-APS-U hardware? Specifically the granite stages, the rotation stage (Aerotech assumed), and the sample-positioning stack (Kohzu assumed). The published overview is taken as current; stage models and axes carried confirm. The TXM stage Assets and models.
OPTICS-1 Blocks-go-live What is the beam-condensing optic upstream of the sample: a capillary condenser, a condenser zone plate, or KB optics? One Condenser Asset bound to the catalog Family; optical type unconfirmed. The condenser optic identity.
OPTICS-2 Blocks-go-live The objective Fresnel zone plate parameters (outermost-zone width, diameter, material) that set the TXM resolution. One ZonePlate Asset bound to the catalog Family; parameters unconfirmed. The zone-plate spec.
OPTICS-3 Nice-to-have The Zernike phase ring used for phase contrast: its parameters and whether it is inserted or retracted per scan. One PhaseRing Asset bound to the catalog Family; inserted/retracted state not modelled. The phase-ring spec and state model.

Detector

ID Priority Question CORA assumes Resolves
DET-1 Blocks-go-live The TXM detector camera model, sensor, and frame rate. One Camera Asset; model and sensor unconfirmed. The camera Model binding.
DET-2 Nice-to-have The TXM indirect-detection objective magnification set and the scintillator material and thickness. An Objective and a Scintillator Asset; details unconfirmed. The detector optics specs.

Supplies

ID Priority Question CORA assumes Resolves
SUP-1 Nice-to-have Is the TXM flight path helium-filled or evacuated, and what gas supplies does the endstation draw on? A flight path exists; its gas is unconfirmed (the projection microscope uses helium, the TXM is unconfirmed). The Supply records and flight-path model.

Answering one of these

Every row above is a question about the real beamline, and any of them can be answered by someone who knows the hardware. You do not need to edit this page or know where it lives.

Open a short issue at github.com/xmap/cora/issues, quote the item ID, and write the answer in plain text. One answer is as welcome as several. If you do not use GitHub, send the same thing to whoever shared this page with you. If a row turns out to be a controls, network, or engineering question, pass it to the right person or tell us who that is.

The priorities mean: Blocks-build, your answer changes the structure of the description, so CORA cannot finalise it until you reply; Blocks-go-live, a guess is fine for the description, but the real value is needed before CORA controls or observes the hardware; Nice-to-have, extra detail for the record.

Once an item is confirmed we record the value and delete the row, so this page always shows only what is still open.