32-ID is a design-phase scaffold built from the published 32-ID docs, which mix pre-APS-U and current values, so almost every value in the Inventory is carried as a fact still to confirm. Each row below is a fact the beamline team owns, not a CORA modelling choice (those are recorded on Model instead). It is a delete-on-answer queue: when an item is answered, the answer lands in the descriptor and the row is removed, with the reason in the commit. Priorities are Blocks-build (the answer changes the structure of the model, so CORA cannot finalize the shape without it), Blocks-go-live (a placeholder is fine for the description, but the real value is needed before CORA observes or drives the hardware), and Nice-to-have.

Topology and scope

The one structural unknown: how the canted source and its branches map onto CORA's Asset model. The answer decides whether 32-ID is one root Asset or two.

ID Priority Question CORA assumes Resolves
TOPO-1 Blocks-build 32-ID is canted: two undulators feeding two branches. Do 32-ID-B and 32-ID-C run off separate beams (two canted branches), and does the 32-ID-A optics set (mask, slits, monochromator, mode shutter) serve both branches or is it duplicated per branch? Which undulator feeds which branch? One root Unit Asset 32-ID with one optics train; the branch multiplicity is unmodelled pending this answer. One-vs-two root Assets and one-vs-two beam walks in the descriptor.

Control and safety

ID Priority Question CORA assumes Resolves
CTRL-1 Blocks-go-live What are the EPICS PV handles (and drive crates / IOC hosts) for each modelled device? Control handles are unassigned; CORA leaves each device handle empty. Wiring each Asset to a real control handle.
PSS-1 Blocks-go-live What are the PSS search-and-secure permit signals for the three hutches (32-ID-A, -B, -C)? Three hutches exist with permit signals to be named. The Enclosure permit signals.
BLEPS-1 Nice-to-have Are the BLEPS (equipment-protection) fault and status signals readable as PVs for an external observer, and which map to a utility versus a specific device? CORA observes outcomes only; it never models the interlock logic. Utility faults map to Supply status, device faults to an Asset condition; the matrix is not modelled. The Supply and Asset condition mapping.

Sources and optics

ID Priority Question CORA assumes Resolves
SRC-1 Blocks-go-live The exact device types and parameters of the two canted undulators (the source table lists "Planar 1.35" downstream and "Planar 2.8" upstream; a "U33" tuning curve is published). How do these labels relate, and what are the periods and gaps? Two InsertionDevice Assets, downstream and upstream, planar; periods and the U33 relationship unconfirmed. The insertion-device specs.
SRC-2 Nice-to-have The fixed front-end mask aperture and position, and the front-end window stack (count, material, thickness). A beam-defining Mask near 24 m and a Window (Be assumed); sizes unconfirmed. The front-end mask and window specs.
MONO-1 Blocks-go-live The Si(111) monochromator detail: per-axis motors, energy range over the 7 to 40 keV span, and whether it drives from a saved per-energy table. One Monochromator Asset, Si(111), 7 to 40 keV; axes and saved positions unconfirmed. The monochromator axes and energy model.
MODE-1 Blocks-build The white-beam to monochromatic switch (the P4-50 mode shutter with its white-beam stop and combined mono stops). Is this a per-branch hard split (one branch always white, one always mono) or a switchable mode on one optics set, and what is the switching sequence and interlock? A ModeShutter plus beam stops; switching is a coordinated, interlocked move, structure tied to TOPO-1. The beam-mode model (and whether it is a new Capability or an energy_change extension, decided on Model).
LAYOUT-1 Nice-to-have A single z-coordinate reference for the layout. The published docs give per-hutch positions but no common origin. z values are carried as approximate from-source and flagged confirm. Exact device z positions.

TXM endstation

ID Priority Question CORA assumes Resolves
TXM-1 Blocks-go-live Is the published TXM component list current post-APS-U, or does it carry pre-APS-U hardware? Specifically the granite stages, the rotation stage (Aerotech assumed), and the sample-positioning stack (Kohzu assumed). The published overview is taken as current; stage models and axes carried confirm. The TXM stage Assets and models.
OPTICS-1 Blocks-go-live What is the beam-condensing optic upstream of the sample: a capillary condenser, a condenser zone plate, or KB optics? One Condenser Asset bound to the catalog Family; optical type unconfirmed. The condenser optic identity.
OPTICS-2 Blocks-go-live The objective Fresnel zone plate parameters (outermost-zone width, diameter, material) that set the TXM resolution. One ZonePlate Asset bound to the catalog Family; parameters unconfirmed. The zone-plate spec.
OPTICS-3 Nice-to-have The Zernike phase ring used for phase contrast: its parameters and whether it is inserted or retracted per scan. One PhaseRing Asset bound to the catalog Family; inserted/retracted state not modelled. The phase-ring spec and state model.

Detector

ID Priority Question CORA assumes Resolves
DET-1 Blocks-go-live The TXM detector camera model, sensor, and frame rate. One Camera Asset; model and sensor unconfirmed. The camera Model binding.
DET-2 Nice-to-have The TXM indirect-detection objective magnification set and the scintillator material and thickness. An Objective and a Scintillator Asset; details unconfirmed. The detector optics specs.

Supplies

ID Priority Question CORA assumes Resolves
SUP-1 Nice-to-have Is the TXM flight path helium-filled or evacuated, and what gas supplies does the endstation draw on? A flight path exists; its gas is unconfirmed (the projection microscope uses helium, the TXM is unconfirmed). The Supply records and flight-path model.