Skip to content

Source

The incident beam, produced, conditioned, and defined before the sample. The controllers that drive these devices are on the Controls page. Each device pairs its human name with its control handle, its key specs, and whether it is field replaceable. new marks a device not yet modeled in CORA; confirm marks a value taken from the docs that staff have not yet verified.

Generated from the descriptor

This page is generated from the descriptor at deployments/p10/beamline.yaml. Edit the descriptor, not this page.

Property Value
Facility petra-iii
Sector P10
Tier Unit
Source insertion-device (confirm: P10 is an undulator beamline (coherent hard X-rays); the OnlineXML exposes the undulator (p10/undulator) and its gap (p10/attributemotor/UNDULATORGAP) but no period or parameters, carried pending (SRC-1))

Source

The P10 undulator source and the optics hutch: the double-crystal monochromator, the optics stages, and the beam shutter, feeding a coherent beam to the three experiment areas.

Enclosure: p10-opt.

Note

Undulator on p10/undulator with the gap as an attributemotor; the DCM is dcmmotor / dcmener with a coupled P10ENERGY axis. The OPT_MOT bank carries the optics positioning, roles not labelled (GROUP-1).

Name Family PV Key specs Replaceable Status
Undulator InsertionDevice undulator: p10/undulator/1
gap: p10/attributemotor/UNDULATORGAP
P10 undulator; gap read from the registry, period not exposed (SRC-1) new confirm
Monochromator Monochromator bragg: p10/dcmmotor/DCM_BRAGG
energy: p10/dcmener/FMBENERGY
energy_mnchr: p10/dcmener/MNCHRMTR
energy_all: p10/multiplemotors/P10ENERGY
double-crystal monochromator (DCM_BRAGG / FMBENERGY, with the coupled P10ENERGY axis); crystal cut and energy range are OPT-1 new confirm
OpticsStages LinearStage bank: p10/motor/OPT_MOT01 the optics-hutch motor bank (OPT_MOT01..32 on p10/motor): mirror / slit / lens motions, per-axis roles not labelled, grouped as one stage (OPT-1, GROUP-1) new confirm
OpticsVirtualStages PseudoAxis bank: p10/vmexecutor/vm_opt_01 the optics-hutch virtual / coupled axes (vm_opt_* on vmexecutor): slit center / gap and coupled optics motions (GROUP-1) new confirm
BeamShutter Shutter shutter: p10/shutter/P10SHUTTER the P10 beam shutter (P10SHUTTER); gates the coherent beam into the experiment areas (PSS-1) new confirm