I13-1¶
hard X-ray ptychography and coherent diffraction imaging (CDI) on the I13 coherence branch; the fleet's first coherent lensless imaging. A deliberately partial first cut.
| Property | Value |
|---|---|
| Facility | Diamond Light Source (EPICS / dodal) |
| Sector | Sector 13 (I13 coherence branch) |
| Source | insertion-device |
| Modelled | reverse-engineered, partial coverage |
Generated from the descriptor
This page is generated from the descriptor at deployments/i13-1/beamline.yaml. Edit the descriptor, not this page.
The device handles are read from the facility's public controls configuration and verified against it; vendor parts, energies, and physical positions are not in it and are carried confirm until beamline staff verify them. Source: DiamondLightSource/dodal.
Enclosures¶
| Enclosure | Role | Facility | Permit signal |
|---|---|---|---|
i13-1 |
experiment-hutch | diamond |
confirm: PSS permit leaf not in dodal; the I13-1 coherence-branch experiment hutch (BL13J), hutch grouping is ENC-1 (PSS-1) |
The beamline¶
The fleet's first dedicated coherent lensless-imaging beamline: ptychography raster-scans a coherent probe over the sample and reconstructs the real-space image downstream.
- Source: the beam, produced and conditioned before the sample.
- Sample: the sample environment and its positioning.
- Controls: the control plane CORA's edge conducts over.
Not yet documented¶
This beamline has no Operations runbook and no live Experiment view, because CORA does not drive it yet. Both pages describe what an operator does with a running system, so writing them for a beamline CORA only models would be invention rather than documentation. The pilot at 2-BM carries both, and shows the shape they take once a deployment goes live.
More¶
- Techniques: what the beamline is for.
- Governance: who acts, and the trust shape that gates them.
- Open questions: the world-facts CORA needs staff to confirm.