IXS¶
momentum-resolved hard inelastic X-ray scattering, 10-ID; modelled from public beamline config.
| Property | Value |
|---|---|
| Facility | NSLS-II (EPICS / bluesky) |
| Sector | Sector 10 |
| Source | insertion-device |
| Modelled | reverse-engineered, full coverage |
Generated from the descriptor
This page is generated from the descriptor at deployments/ixs/beamline.yaml. Edit the descriptor, not this page.
The device handles are read from the facility's public controls configuration and verified against it; vendor parts, energies, and physical positions are not in it and are carried confirm until beamline staff verify them. Source: NSLS2/ixs-profile-collection.
Enclosures¶
| Enclosure | Role | Facility | Permit signal |
|---|---|---|---|
10-ID-A |
optics-hutch | nsls2 |
confirm: PSS permit leaf not in source; the front-end and photon shutters and interlock tier are absent from the profile collection and are PSS-1 |
10-ID-B |
optics-hutch | nsls2 |
confirm: PSS permit leaf unknown; the high-resolution-mono hutch; whether A/B/C are one optics hutch or several is ENC-1 (PSS-1) |
10-ID-C |
optics-hutch | nsls2 |
confirm: PSS permit leaf unknown; transport optics zone (ENC-1, PSS-1) |
10-ID-D |
experiment-hutch | nsls2 |
confirm: PSS permit leaf unknown; the IXS endstation hutch (ENC-1, PSS-1) |
The beamline¶
CORA's first hard inelastic-scattering beamline: set Q with a six-circle arm, scan the incident energy against a fixed diced-crystal analyzer, and point-detect to build I(Q, energy-loss).
- Source: the beam, produced and conditioned before the sample.
- Sample: the sample environment and its positioning.
- Detector: what records the beam after the sample.
- Controls: the control plane CORA's edge conducts over.
Not yet documented¶
This beamline has no Operations runbook and no live Experiment view, because CORA does not drive it yet. Both pages describe what an operator does with a running system, so writing them for a beamline CORA only models would be invention rather than documentation. The pilot at 2-BM carries both, and shows the shape they take once a deployment goes live.
More¶
- Techniques: what the beamline is for.
- Governance: who acts, and the trust shape that gates them.
- Open questions: the world-facts CORA needs staff to confirm.