Source¶
The incident beam, produced, conditioned, and defined before the sample. The controllers that drive these devices are on the Controls page. Each device pairs its human name with its control handle, its key specs, and whether it is field replaceable. new marks a device not yet modeled in CORA; confirm marks a value taken from the docs that staff have not yet verified.
Generated from the descriptor
This page is generated from the descriptor at deployments/p01/beamline.yaml. Edit the descriptor, not this page.
| Property | Value |
|---|---|
| Facility | petra-iii |
| Sector | P01 |
| Tier | Unit |
| Source | insertion-device (confirm: P01 is an undulator beamline (2.5-80 keV); the OnlineXML exposes undulator gap/taper virtual motors (gap_a, gap_b, taper_a, taper_b on p01/attributemotor) but no insertion-device period or parameters, carried pending (SRC-1)) |
Source¶
The P01 undulator source. The OnlineXML exposes the gap and taper as virtual (attributemotor) axes rather than an insertion-device device server; the period and parameters are not published.
Enclosure: p01-oh1.
Note
Undulator gap / taper virtual motors on p01/attributemotor; which physical insertion device and its period / harmonics is SRC-1.
| Name | Family | PV | Key specs | Replaceable | Status |
|---|---|---|---|---|---|
Undulator |
InsertionDevice |
gap_a: p01/attributemotor/gap.01gap_b: p01/attributemotor/gap.02taper_a: p01/attributemotor/taper.01taper_b: p01/attributemotor/taper.02 |
P01 undulator source; gap_a/gap_b and taper_a/taper_b are virtual axes, suggesting a two-section or canted-undulator arrangement, unconfirmed (SRC-1); energy reach 2.5-80 keV per the DESY catalog | new confirm |
Oh1 optics¶
The first optics hutch: the double-crystal monochromator and the two horizontal-deflection mirrors that monochromate and steer the beam, plus the front-end definition slits.
Enclosure: p01-oh1.
Note
Handles read from the OnlineXML (p01/dcmmotor, p01/dcmener, p01/motor/oh1.*). The DCM energy / Bragg pseudo-motors are virtual; crystal cut and the mirror coatings / stripes are OPT-1.
| Name | Family | PV | Key specs | Replaceable | Status |
|---|---|---|---|---|---|
Monochromator |
Monochromator |
bragg: p01/dcmmotor/oh.01energy: p01/dcmener/oh.01lateral: p01/motor/oh1.08parallel: p01/motor/oh1.10perpendicular: p01/motor/oh1.09pitch: p01/motor/oh1.11roll: p01/motor/oh1.02offset: p01/attributemotor/fmbexitoffset.01y: p01/vmexecutor/dcm_zy1: p01/motor/oh1.03y2: p01/motor/oh1.04y3: p01/motor/oh1.07 |
double-crystal monochromator (FMB-Oxford-style: dcm_bragg / dcm_ener virtual energy axis, fixed-exit offset, three y jacks); crystal cut (Si 111 / 311) and energy range are OPT-1 | new confirm |
|
Mirror1 |
Mirror |
pitch: p01/motor/oh1.17x: p01/motor/oh1.18rotation: p01/motor/oh1.21y: p01/motor/oh1.22 |
first OH1 deflection / harmonic-rejection mirror (oh1_m1); coating / stripe and incidence angle are OPT-1 | new confirm |
|
Mirror2 |
Mirror |
pitch: p01/motor/oh1.25x: p01/motor/oh1.26rotation: p01/motor/oh1.29y: p01/motor/oh1.30 |
second OH1 deflection mirror (oh1_m2); coating / stripe and incidence angle are OPT-1 | new confirm |
|
FrontEndSlit1 |
Slit |
center_y: p01/motor/oh1.12gap_y: p01/motor/oh1.05 |
first front-end definition slit (fe_slit1); vertical center / gap only in the registry (OPT-1) | new confirm |
|
FrontEndSlit2 |
Slit |
center_y: p01/motor/oh1.14gap_y: p01/motor/oh1.13left: p01/motor/oh1.15right: p01/motor/oh1.16 |
second front-end definition slit (fe_slit2) | new confirm |
Oh2 optics¶
The second optics hutch: the secondary defining slits, a diamond beam monitor, and the RIXS pre-optics translation that selects the EH3 spectroscopy branch.
Enclosure: p01-oh2.
Note
Handles read from the OnlineXML (p01/motor/oh2., p01/vmexecutor/slit1_). The diamond monitor and rixs translation roles are OPT-1 / DET-1.
| Name | Family | PV | Key specs | Replaceable | Status |
|---|---|---|---|---|---|
SecondarySlit |
Slit |
bottom: p01/motor/oh2.45top: p01/motor/oh2.46left: p01/motor/oh2.47right: p01/motor/oh2.48center_x: p01/vmexecutor/slit1_cxcenter_y: p01/vmexecutor/slit1_cygap_x: p01/vmexecutor/slit1_dxgap_y: p01/vmexecutor/slit1_dy |
secondary defining slit (slit1: four blades + cx/cy/dx/dy virtual center/gap motors on vmexecutor) | new confirm |
|
DiamondMonitor |
FluxMonitor |
y: p01/motor/oh2.28 |
diamond beam-position / flux monitor insert (oh2_diam_y); a single y insertion axis, role is a candidate FluxMonitor (OPT-1) | new confirm |
|
RIXSPreOptic |
LinearStage |
x: p01/motor/oh2.04 |
RIXS pre-optic translation (rixs_x); selects / positions the EH3 spectroscopy branch optic, role and optic kind are OPT-1 | new confirm |