Open questions

What CORA needs the CDI team to confirm. This model is reverse-engineered from public open source (the NSLS2/cdi-profile-collection profile collection and the NSLS2/cditools device library): the EPICS PVs are read from them, but vendor identities, physical positions, and the timing configuration are not. Each row is a fact the beamline team owns. It is a delete-on-answer queue.

Priorities: Blocks-build, Blocks-go-live, Nice-to-have.

Source and safety

ID Priority Question CORA assumes Resolves
SRC-1 Nice-to-have IVU18 undulator period, gap range, and harmonic usage. The device (SR:C09-ID:G1{IVU18:1}) is confirmed. An in-vacuum undulator, identity-only. The InsertionDevice settings.
PSS-1 Blocks-go-live The PSS search-and-secure permit-leaf PVs and the photon-shutter PVs. Neither is in source. The permit signal is a confirm note, not a guessed PV. The Enclosure permit signals.
ENC-1 Nice-to-have Whether the 09IDB branch zone (Slt:DM3, the quadrant BPM) is a distinct access-gated enclosure or part of the optics hutch. Two enclosures (9-ID-A optics, 9-ID-C endstation); 09IDB folded into the optics zone. The Enclosure boundaries.
MACHINE-1 Nice-to-have The storage-ring state CDI reads (current, fill, status). Observe-only machine state, a loose StorageRing; the exact PVs beyond ring_current pending. The machine-state observation.
GOV-1 Nice-to-have The NSLS-II operator pool and safety-review structure (site-level, shared across the beamlines). Carried pending on the NSLS-II Site, not instantiated per beamline. The governance principals.

Optics

ID Priority Question CORA assumes Resolves
DCM-1 Nice-to-have The Si DCM cryo detail and full range (the Si(111) reflection and d = 3.1287 A are read from the Energy model), and the DMM multilayer coating and bandpass. Both monochromators (Mono:HDCM, Mono:DMM) are in source. Two Monochromator Assets, Si(111) recorded, other settings blank. The Monochromator settings.
KB-1 Blocks-go-live The KB mirror focal size, coating / stripe, and working distance; whether both VKB and HKB are always installed. A Mirror Asset (the KB pair); focus geometry blank. The KB nanofocus spec.
ENERGY-1 Nice-to-have Whether incident energy is ever scanned as the measurement, and the true energy range (the 5-15 keV bounds are marked TODO: CHECK in source). Fixed-energy imaging; the range left provisional. The energy Capability decision.

Sample and detectors

ID Priority Question CORA assumes Resolves
STAGE-1 Blocks-go-live Which endstation tower (TDMS:T1 / TDMS:T2) carries the sample versus the detector, the sample-to-detector distance that sets the q-range, and the full Gon:1 goniometer axis set. Some tower axes are read-only pending commissioning in source. Two LinearStage towers and a Goniometer; roles and distance deferred. The endstation geometry.
DET-1 Blocks-go-live Which detector (Eiger2 / Merlin) is primary for which technique, the foil materials / thicknesses, and whether a direct-beam beamstop is installed (none is in source). Both Cameras; Eiger2 primary; no beamstop modelled. The detector roster and beamstop.
CAM-1 Nice-to-have Which diagnostic cameras (the BCU inline camera, the sample camera, the optics-module Prosilicas) are live. The inline and sample cameras modelled; others noted. The diagnostic-camera set.
DIAG-1 Nice-to-have The foil-monitor channel map and the quadrant / diamond BPM channels (the diamond BPM was repurposed from ion-chamber use in source). Read-only flux and beam-position probes; channel maps blank. The FluxMonitor and PositionMonitor bindings.

Controls and technique scope

ID Priority Question CORA assumes Resolves
TIMING-1 Blocks-go-live The exposure-gating chain. The profile collection exposes no trigger box (no Zebra / PandA startup file, no shutter PVs); the Eiger2 and Merlin carry internal and external trigger modes. How is a coherent-imaging exposure gated and synchronized with the scan? Detector-internal triggering; no floor trigger box modelled. The triggering chain.
DRIVE-1 Blocks-go-live The motion-controller box models, firmware, IPs behind the EPICS motor records. One MotionController family bound (EndstationMotionController), specifics blank. The MotionController Models.
TECH-1 Blocks-go-live Do the coherent-imaging Methods (forward CDI, ptychography, Bragg CDI) enter CORA's catalog, or stay deferred? This is the same owner-scope decision 8-ID opened. Methods deferred (rendered unlinked), no Practice recorded. The coherent-imaging Method scope.

Answering one of these

Every row above is a question about the real beamline, and any of them can be answered by someone who knows the hardware. You do not need to edit this page or know where it lives.

Open a short issue at github.com/xmap/cora/issues, quote the item ID, and write the answer in plain text. One answer is as welcome as several. If you do not use GitHub, send the same thing to whoever shared this page with you. If a row turns out to be a controls, network, or engineering question, pass it to the right person or tell us who that is.

The priorities mean: Blocks-build, your answer changes the structure of the description, so CORA cannot finalise it until you reply; Blocks-go-live, a guess is fine for the description, but the real value is needed before CORA controls or observes the hardware; Nice-to-have, extra detail for the record.

Once an item is confirmed we record the value and delete the row, so this page always shows only what is still open.