Skip to content

Source

The incident beam, produced, conditioned, and defined before the sample. The controllers that drive these devices are on the Controls page. Each device pairs its human name with its control handle, its key specs, and whether it is field replaceable. new marks a device not yet modeled in CORA; confirm marks a value taken from the docs that staff have not yet verified.

Generated from the descriptor

This page is generated from the descriptor at deployments/13-id/beamline.yaml. Edit the descriptor, not this page.

Property Value
Facility aps
Sector Sector 13 (GSECARS)
Tier Unit
Source insertion-device (confirm: 13-ID is an undulator sector shared with 13-ID-C / 13-ID-E; the undulator is energy-tracked with the mono but not exposed as a device in the support tree read, so the source detail is SRC-1)

Machine

The machine-level source state, observed not driven.

Enclosure: 13-ID-optics.

Note

Observe-only APS machine state, the loose StorageRing pattern reused across the APS deployments (MACHINE-1). The undulator is energy-tracked with the mono but not surfaced as a device here (SRC-1).

Name Family PV Key specs Replaceable Status
StorageRing StorageRing confirm: APS storage-ring state (current, fill, status); observe-only, the exact PVs are MACHINE-1 APS storage-ring state; observe-only (MACHINE-1) new confirm

Optics

The shared 13-ID-A silicon monochromator, the incident-energy axis, the K-B and carbon focusing mirrors, the slits, the clean-up pinhole, and the attenuator.

Enclosure: 13-ID-optics.

Note

All reuse existing catalog Families. The DCM binds Monochromator (the 2-BM precedent); the mirrors bind Mirror with their curvature / ellipticity as PseudoAxis; the slits bind Slit; the pinhole binds Aperture; the attenuator binds Filter.

Name Family PV Key specs Replaceable Status
Monochromator Monochromator 13IDA: the shared 13-ID-A silicon double-crystal monochromator (status 13IDA_EMONO:); undulator-tracked; crystal cut and energy range are MONO-1 new confirm
BeamEnergy PseudoAxis 13IDE:En the derived beamline-energy virtual axis over the DCM and the tracked undulator (MONO-1) new confirm
FocusingMirror Mirror confirm: the K-B focusing mirror pair (vertical / horizontal, curvature and ellipticity sum-and-difference axes) and the upstream carbon mirrors; coatings and the curvature PseudoAxis are OPT-1 K-B focusing mirror pair plus carbon harmonic-rejection mirrors; curvature / ellipticity bind PseudoAxis (OPT-1) new confirm
BeamSlit Slit confirm: the table-top DAC-defining slits (DACV / DACH) and the upstream beam-defining slits; blade-axis map is OPT-2 the beam-defining and DAC table-top slits (DACV / DACH); blade-axis map is OPT-2 new confirm
CleanupPinhole Aperture confirm: the clean-up pinhole on its X / Y / Z carriers, removing the slit-scatter halo before the DAC; the carriers bind LinearStage, the opening binds Aperture (APERTURE-1) the clean-up pinhole before the cell (APERTURE-1) new confirm
Attenuator Filter 13IDD:filter: the attenuator paddle / filter set protecting the detector and trimming flux (the 2-BM C / Al precedent); foil set is ATTN-1 new confirm