Procedures¶
Operation BC Procedures registered at 2-BM.
Each Procedure binds a Method + Practice + Plan to a set of target Assets. See Model for the aggregate shape.
| Procedure | Target Assets |
|---|---|
motor_homing |
Aerotech_ABRS_rotary, Sample_top_X |
first_light |
Shutter_2BM + image chain |
detector_dark_baseline |
Shutter_2BM + image chain |
detector_flat_baseline |
Shutter_2BM + image chain |
resolution_alignment |
Optique_Peter_focus_Z + image chain |
focus_alignment |
Sample_top_Z + image chain |
center_alignment |
Aerotech_ABRS_rotary, Sample_top_X + image chain |
roll_alignment |
Aerotech_ABRS_rotary, Sample_top_Roll + image chain |
pitch_alignment |
Aerotech_ABRS_rotary, Sample_top_Pitch + image chain |
alignment_calibration |
Aerotech_ABRS_rotary, roll + pitch motors + image chain |
hexapod_reboot |
Hexapod_2BM |
Image chain = Oryx_5MP_camera, Scintillator_LuAG.
Pending¶
| Procedure | Target Assets |
|---|---|
alignment_auto_chain |
alignment Assets (calibration + Step1..4) |
energy_calibration |
channel-cut crystal + DMM |
ioc_restart |
EPICS IOC-hosted Assets |
vibration_baseline |
high-speed camera |
mirror_recoat_return |
Mirror_2BM |