What CORA needs the P03 team to confirm before the model can be trusted.
P03 was reverse-engineered from P03's own public OnlineXML device registry (gitlab.desy.de/petra-iii-debian-packages/python-nxstools-extras-p03, branch debian/jessie) and a verified research brief, not from a live connection. The registry carries real Tango device names and control handles, but no focal sizes, multilayer d-spacing, or energy calibration. P03 is CORA's fifth PETRA III beamline and its first SAXS / WAXS beamline. Each row below is a fact the beamline team owns, not a CORA modelling choice (those are on Model). It is a delete-on-answer queue. Priorities are Blocks-build, Blocks-go-live, and Nice-to-have.
The hutch grouping: shared optics feeding a microfocus endstation and a nanofocus GINIX endstation?
A p03-optics section (shared with P02) and two p03-microfocus / p03-nanofocus endstations.
The Enclosure grouping.
HOST-1
Nice-to-have
The first defining slit reports on the P02 optics host (haspp02oh1) and a Lambda on the bare petra3 host. Shared Tango DB hosts, or registry artifacts?
The shared P02 / P03 optics are homed in p03-optics; the hosts are flagged.
The device-to-host mapping.
GROUP-1
Nice-to-have
The per-axis roles of the motor banks (expmi_mot01..64 microfocus, mot01..40 nanofocus).
Grouped as sample-stage Assets carrying the bank prefix; per-axis roles pending.
The detector roster per experiment, the SAXS-vs-WAXS assignment (Pilatus 300k / 1M), the sample-to-detector distance, and the fluorescence-detector channel count.
Camera Pilatus detectors plus EnergyDispersiveSpectrometer MCA / XIA detectors; assignment pending.
The Tango device handles per P03 device, and whether the OnlineXML debian/jessie branch matches the live Tango database.
The handles read from the public OnlineXML, carried pending; the floor is Tango + Sardana.
Binding each Asset's control handle.
PSS-1
Blocks-go-live
The DESY personnel-safety permit signals, the photon / front-end shutters, and the role of the GINIX experiment shutter (absent / partial in the OnlineXML).
Permit leaves and shutters to be named; the GINIX shutter bound to Shutter, safety role pending.
The Enclosure permit signals and the safety tier.
SUP-1
Nice-to-have
The vacuum extent and the cooling / beam supplies.
Photon beam, cooling water, vacuum.
The Supply observations.
GOV-1
Nice-to-have
The DESY operator pool and safety-review structure (site-level), and the shared-optics permit coupling with P02.
Carried pending on the PETRA III Site, not instantiated per beamline.