Skip to content

P10

coherent hard X-ray applications (XPCS, coherent diffraction imaging / ptychography) across an optics hutch and three experiment areas (E1 coherent imaging, E2 XPCS / diffraction, LAB); a further XPCS beamline (after APS 8-ID and NSLS-II CHX) and the first PETRA III practice to bind a graduated catalog Method (xpcs, earned at 8-ID) rather than a pending slug; coins no new Family, with the widest detector suite in the set.

Property Value
Facility PETRA III (Tango / Sardana)
Sector P10
Source insertion-device
Modelled reverse-engineered, full coverage

Generated from the descriptor

This page is generated from the descriptor at deployments/p10/beamline.yaml. Edit the descriptor, not this page.

The device handles are read from the facility's public controls configuration and verified against it; vendor parts, energies, and physical positions are not in it and are carried confirm until beamline staff verify them. Source: python-nxstools-extras-p10.

Enclosures

Enclosure Role Facility Permit signal
p10-opt optics-hutch petra-iii confirm: DESY PSS permit signal for the P10 optics hutch; not in the OnlineXML (PSS-1)
p10-e1 experiment-hutch petra-iii confirm: DESY PSS permit signal for E1 (coherent imaging); not in the OnlineXML (PSS-1)
p10-e2 experiment-hutch petra-iii confirm: DESY PSS permit signal for E2 (XPCS / diffraction); not in the OnlineXML (PSS-1)
p10-lab experiment-hutch petra-iii confirm: DESY PSS permit signal for the LAB area; not in the OnlineXML (PSS-1)

The beamline

Coherence applications (XPCS, coherent imaging / ptychography) across three areas; the first PETRA III beamline whose primary technique binds a graduated catalog Method directly.

  • Source: the beam, produced and conditioned before the sample.
  • Sample: the sample environment and its positioning.
  • Detector: what records the beam after the sample.
  • Controls: the control plane CORA's edge conducts over.

Not yet documented

This beamline has no Operations runbook and no live Experiment view, because CORA does not drive it yet. Both pages describe what an operator does with a running system, so writing them for a beamline CORA only models would be invention rather than documentation. The pilot at 2-BM carries both, and shows the shape they take once a deployment goes live.

More