The indirect-detection imaging system: a scintillator converts the transmitted X-ray image to visible light, visible-light microscope optics relay it, and a camera records 2-D projections that are reconstructed off-line into 3-D micron-resolution tomograms.

Enclosure: 19-BM-D.

Note

Specific scintillator, microscope-optics, and camera selections are procured after the FDR and are carried as questions (DET-1). The microscope composes the cross-facility Microscope Assembly (scintillator + optics + camera presenting the Detector Role), the same blueprint 2-BM uses; it is not a Family of its own.

Name Family PV Key specs Replaceable Status
DetectorStage Table positions the indirect-detection system in air, downstream of the sample; axis layout TBD new confirm
Scintillator Scintillator confirm: scintillator selection procured post-FDR (DET-1)
converts the X-ray projection to a visible-light image
new confirm
Microscope Housing confirm: microscope-optics selection procured post-FDR (DET-1)
the visible-light microscope chassis: a Housing that anchors the cross-facility Microscope Assembly (scintillator + optics + camera) presenting the Detector Role; the Fixture is registered once hardware is chosen
new confirm
Camera Camera confirm: camera selection procured post-FDR (DET-1)
records 2-D projection images for off-line reconstruction
new confirm

Beam stops

The photon and bremsstrahlung stops at the downstream end of 19-BM-D, plus the extra downstream-wall shielding required for a white-beam BM station.

Enclosure: 19-BM-D.

Note

all RSS / safety elements at the downstream wall; the guillotines provide the APS TB-44 extra lead area.

Name Family PV Key specs Replaceable Status
PhotonStop BeamStop passive
sketch: A359-M100
material: water-cooled copper block
cooling: water-cooled, in series with the upstream Be window; flow monitored by the BLEPS (BLEPS-1)
absorbs the transmitted white beam after the sample / detector region
new confirm
BremsstrahlungStop BeamStop passive
sketch: A359-K3
material: chevron stack of lead bricks
absorbs bremsstrahlung behind the photon stop, at the downstream wall
new confirm
DownstreamGuillotines Shielding passive
material: Pb, >= 12 mm thick each (two guillotines)
movable PSS-grade shielding on the inside of the downstream wall; the 1 x 1 m2 extra-lead area required by APS TB-44; aligned in place (no internal fiducialisation). One is held open during operation, coupling 19-BM-C and 19-BM-D into one shielded volume (ENC-1)