ID19¶
parallel-beam hard X-ray microtomography, radiography, and phase-contrast imaging on the long imaging beamline.
| Property | Value |
|---|---|
| Facility | ESRF (BLISS / Beacon / Tango / IcePAP) |
| Source | insertion-device |
| Modelled | reverse-engineered, full coverage |
Generated from the descriptor
This page is generated from the descriptor at deployments/id19/beamline.yaml. Edit the descriptor, not this page.
The device handles are read from the facility's public controls configuration and verified against it; vendor parts, energies, and physical positions are not in it and are carried confirm until beamline staff verify them. Source: gitlab.esrf.fr id19/beamline_configuration.
Enclosures¶
| Enclosure | Role | Facility | Permit signal |
|---|---|---|---|
id19-optics |
optics-hutch | esrf |
confirm: ESRF PSS permit signal behind the frontend shutter; not in the config (PSS-1) |
id19-experiment |
experiment-hutch | esrf |
confirm: ESRF PSS permit signal behind bsh1/bsh2; not in the config (PSS-1) |
The beamline¶
The fleet's first imaging beamline on a non-EPICS floor: microtomography on the ESRF BLISS / Tango control system, reusing the established tomography spine.
- Source: the beam, produced and conditioned before the sample.
- Sample: the sample environment and its positioning.
- Detector: what records the beam after the sample.
- Controls: the control plane CORA's edge conducts over.
More¶
- Techniques: what the beamline is for.
- Governance: who acts, and the trust shape that gates them.
- Open questions: the world-facts CORA needs staff to confirm.