Skip to content

ID19

parallel-beam hard X-ray microtomography, radiography, and phase-contrast imaging on the long imaging beamline.

Property Value
Facility ESRF (BLISS / Beacon / Tango / IcePAP)
Source insertion-device
Modelled reverse-engineered, full coverage

Generated from the descriptor

This page is generated from the descriptor at deployments/id19/beamline.yaml. Edit the descriptor, not this page.

The device handles are read from the facility's public controls configuration and verified against it; vendor parts, energies, and physical positions are not in it and are carried confirm until beamline staff verify them. Source: gitlab.esrf.fr id19/beamline_configuration.

Enclosures

Enclosure Role Facility Permit signal
id19-optics optics-hutch esrf confirm: ESRF PSS permit signal behind the frontend shutter; not in the config (PSS-1)
id19-experiment experiment-hutch esrf confirm: ESRF PSS permit signal behind bsh1/bsh2; not in the config (PSS-1)

The beamline

The fleet's first imaging beamline on a non-EPICS floor: microtomography on the ESRF BLISS / Tango control system, reusing the established tomography spine.

  • Source: the beam, produced and conditioned before the sample.
  • Sample: the sample environment and its positioning.
  • Detector: what records the beam after the sample.
  • Controls: the control plane CORA's edge conducts over.

Not yet documented

This beamline has no Operations runbook and no live Experiment view, because CORA does not drive it yet. Both pages describe what an operator does with a running system, so writing them for a beamline CORA only models would be invention rather than documentation. The pilot at 2-BM carries both, and shows the shape they take once a deployment goes live.

More