Skip to content

Source

The incident beam, produced, conditioned, and defined before the sample. A walk along the source-stage devices; the sample and detection stages are documented as their own composed-fixture pages, the controllers that drive these devices are on the Controls page, and the supplies they draw on are in Operations. Each device pairs its human name with the EPICS handle, its key specs, and whether it is field replaceable. new marks a device not yet modeled in CORA; confirm marks a value taken from the docs that staff have not yet verified.

Generated from the descriptor

This page is generated from the descriptor at deployments/lcls-mfx/beamline.yaml. Edit the descriptor, not this page. For the CORA Asset model, settings, vendor catalog, drawings, and wiring, see Inventory.

Property Value
Facility slac
Tier Unit
Source free-electron-laser (confirm: SASE hard-X-ray FEL on the shared LCLS linac + HXR undulator line; photon energy is set per-shot (vernier / undulator), not as a standing setpoint, and the same source feeds many co-equal instruments one at a time (SRC-1 / TOPO-1).
)

Enclosures

Enclosure Role Facility Permit signal
LCLS-FEE optics-hutch slac confirm: LCLS PPS search-and-secure signal TBD; shared front-end / transport (TOPO-1, PSS-1)
LCLS-MFX experiment-hutch slac confirm: LCLS PPS + pump-probe BTPS laser interlock TBD (PSS-1, LASER-1)

Undulator source

The free-electron-laser source and its per-shot pulse-energy monitor.

Enclosure: LCLS-FEE.

Note

LCLS is a linac-driven FEL, not a storage ring, so the loose StorageRing family used by the synchrotron exercises does not fit; machine beam is carried as a PhotonBeam Supply (MACHINE-1). The undulator photon energy is set per shot (vernier / undulator gap); CORA has no per-shot energy setpoint, and the undulator-as-driven-source with energy->gap control is deferred (SRC-1).

Name Family PV Key specs Replaceable Status
Undulator InsertionDevice confirm: LCLS HXR undulator line (USEG / vernier energy request); per-segment handles TBD (SRC-1) device type: SASE free-electron-laser undulator
the FEL source; SASE / self-seeded mode and per-shot photon energy are a DAQ-plane datum, not a standing setpoint (SRC-1, DAQ-1)
new confirm
GasDetector FluxMonitor confirm: GDET:FEE1:241:ENRC (read via BeamStats, not a happi device) FEL pulse-energy gas detector; presents the Sensor Role; loose family reused from i22 (DIAG-1). Per-shot pulse energy is correlated in the DAQ by pulse-ID (DAQ-1) new confirm

Front end transport

The shared solid attenuators, offset mirrors, X-ray transport mirrors, PPS stopper, and transport diagnostics that condition and steer the beam toward MFX.

Enclosure: LCLS-FEE.

Note

The X-ray transport mirrors (XRT) are where the single FEL source is steered down one branch to one instrument at a time; CORA has no switched-shared-source model, so the routing is carried here but the topology is deferred (TOPO-1). Vacuum gate valves are floor (not modelled), as at i03.

Name Family PV Key specs Replaceable Status
FrontEndAttenuator Filter SATT:FEE1:320 solid-Si front-end attenuator; the existing Filter Family covers it (adversarial-verified). Target-transmission solving (foil combination for a requested transmission, energy-dependent) is the deferred Attenuable leg (ATT-1) new confirm
FrontEndMirror1 Mirror FEE1:M1H first horizontal offset mirror; OffsetMirror folds into the Mirror Family new confirm
FrontEndMirror2 Mirror FEE1:M2H second horizontal offset mirror new confirm
TransportMirror2 Mirror XRT:M2H X-ray-transport steering mirror new confirm
TransportMirror3 Mirror XRT:M3H X-ray-transport steering mirror that routes the beam to the experiment branch; the switched-source seam (one source, many instruments) lives here (TOPO-1) new confirm
TransportStopper Shutter HFX:DG2:STP:01 PPS-interlocked beam stopper on the transport line; permit signal to confirm (PSS-1) new confirm
TransportSlits Slit HFX:DG2:JAWS transport-line 4-blade slits (gap/center virtual axes) new confirm
TransportIPM FluxMonitor HFX:DG2:IPM intensity-position monitor; presents the Sensor Role for both flux (FluxMonitor) and beam position (Diagnostic); loose families reused (DIAG-1). Per-shot intensity normalization is a DAQ-plane concern (DAQ-1) new confirm
TransportImager Scintillator HFX:DG2:PIM profile-imager (YAG screen + camera); the screen presents Scintillator, the camera presents Camera (Detector Role) new confirm