Skip to content

The beamline

The 19-BM-FACT beamline as areas you can jump to: the stages the beam passes through, plus the controls that drive them and the resources they draw on. Design-phase.

The beamline divides into two kinds of thing. Along the beam, in order, sit the stages: the Source that delivers and conditions the beam in the front-end optics enclosure, the Sample stage in air at the endstation, and the Detector that records what comes through. Cutting across all of them are the shared concerns: the Controls that drive the hardware, and the resources the beamline draws on.

The stages are containment trees of apparatus (Asset.parent_id); controls relate to that apparatus sideways, by controller_id, and a resource is a Supply in its own right.

Enclosures

19-BM-FACT runs in filtered white-beam mode only, with beam present in all enclosures whenever the front-end shutter is open. Three access-gated volumes contain it:

Enclosure Role What is in it
19-BM-A Front-end optics (FOE) exit mask, bremsstrahlung collimators, white-beam slits, the F3-30 filter unit, the gate valve, UHV transport
19-BM-C Transport shielded UHV transport only; the beam passes through entirely in vacuum, no intercepts, so no Device Assets are registered here
19-BM-D Endstation the Be and Kapton windows, the in-air sample stage, the indirect-detection imaging system, and the downstream beam stops

19-BM-C and 19-BM-D share a downstream-wall guillotine that is held open during operation, so they act as a single shielded volume from a radiation-safety perspective. Whether CORA models them as one Enclosure or two coupled ones is an open question (ENC-1).

Stages

  • Source: the bending-magnet beam delivery and conditioning. There is no monochromator and no mirror optics, so the spectrum is set entirely by the F3-30 filter unit, not by optic moves.
  • Sample: the in-air endstation. The beamline vacuum terminates at a water-cooled Be window; a Kapton window transitions to air, where the rotary and positioning stages place the specimen in the white beam. The stage is designed to host a robotic sample changer for autonomous operation.
  • Detector: the indirect-detection imaging system (scintillator, microscope optics, camera) downstream of the sample, plus the photon and bremsstrahlung stops at the downstream wall.

Shared

  • Controls: the EPICS control stack and the high-throughput trigger scheme.
  • Resources: the continuously-available supplies a run needs (photon beam, cooling water, vacuum); carried in the descriptor, with no operations page yet in this design phase.

Reference

The cross-cutting view that spans every area:

  • Inventory: the full planned CORA Asset model (every device by parent_id, with Families and the values pending confirmation). The PSS permit signals are APS facility signals, not yet named (see Open questions).