Controls¶
The control stack and access path. Design-phase; handles not yet assigned.
32-ID runs on the APS EPICS control stack, the same floor as the 2-BM pilot. CORA observes that floor and, where it replaces TomoScan-style scan and alignment orchestration, conducts over it; it does not replace EPICS itself.
Device handles¶
CORA models each device's control handle as an opaque string set at the edge. The 32-ID source docs do not publish the PV handles, drive crates, or IOC hosts for the modelled devices, so every device's handle is left empty in the descriptor rather than filled with an invented value. Wiring each Asset to a real handle is tracked by CTRL-1 on Open questions.
Access¶
The TXM is operated from the TXMTWO workstation, reachable remotely over delos.aps.anl.gov with an APS badge and an active proposal. This is the operator's entry point to the EPICS user interface; CORA records it as context, not as a modelled control path.
Triggering¶
The TXM trigger and timing scheme (the camera and stage synchronization during a tomographic scan) is not published in the source docs and is not modelled here. It joins, as a TimingController device, once the scan hardware and PVs are confirmed (CTRL-1, TXM-1).
Equipment protection¶
32-ID carries a BLEPS equipment-protection interlock separate from the personnel PSS, as 2-BM does. CORA does not model the interlock logic; it would only observe outcomes, mapping utility faults to Supply status and device faults to an Asset condition. That mapping is BLEPS-1 on Open questions.