Skip to content

Source

The incident beam, produced, conditioned, and defined before the sample. A walk along the source-stage devices; the sample and detection stages are documented as their own composed-fixture pages, the controllers that drive these devices are on the Controls page, and the supplies they draw on are in Operations. Each device pairs its human name with the EPICS handle, its key specs, and whether it is field replaceable. new marks a device not yet modeled in CORA; confirm marks a value taken from the docs that staff have not yet verified.

Generated from the descriptor

This page is generated from the descriptor at deployments/i13-1/beamline.yaml. Edit the descriptor, not this page. For the CORA Asset model, settings, vendor catalog, drawings, and wiring, see Inventory.

Property Value
Facility diamond
Sector Sector 13 (I13 coherence branch)
Tier Unit
Source insertion-device (confirm: I13 is an undulator beamline; dodal exposes only the I13-1 coherence-branch endstation, not the shared source, so the undulator and the shared optics are deferred (SRC-1, OPT-1))

Enclosures

Enclosure Role Facility Permit signal
i13-1 experiment-hutch diamond confirm: PSS permit leaf not in dodal; the I13-1 coherence-branch experiment hutch (BL13J), hutch grouping is ENC-1 (PSS-1)

Machine

The machine-level source state, observed not driven. The shared I13 source and optics are upstream and not yet in scope (SRC-1, OPT-1).

Enclosure: i13-1.

Note

dodal's Synchrotron device is the observe-only machine state, the loose StorageRing pattern reused from the Diamond siblings (MACHINE-1). The undulator, monochromator, mirrors, and slits are absent from the i13_1 dodal module and are deferred (SRC-1, OPT-1).

Name Family PV Key specs Replaceable Status
StorageRing StorageRing confirm: Diamond storage-ring state (current, fill); observe-only, the exact PVs are MACHINE-1 Diamond storage-ring state; observe-only; the shared I13 source / optics are deferred (SRC-1, OPT-1, MACHINE-1) new confirm