Cautions¶
Caution BC Cautions targeting facility-level Assets.
A Caution carries operator tribal knowledge (category, severity, text, workaround) on a target Asset or Procedure. See Model for the aggregate shape.
| Target | Category | Severity | Text |
|---|---|---|---|
| APS Site Asset | OperationalWindow |
Notice |
Top-up injections cause brief beam-flux transients (~0.5s) every few minutes |
Pending¶
| Target | Category | Severity | Text |
|---|---|---|---|
| APS Site Asset | Storage-ring scheduled downtimes | ||
| Shared facility equipment | Equipment quirks | ||
| Shared optics | Calibration drift |