Runs¶
Run BC Runs registered at 2-BM.
A Run is the operator-started execution of a Plan against a Subject. Runs are composed by Campaigns and produce Datasets. See Model for the aggregate shape.
| Run | Subject | Campaign |
|---|---|---|
Proposal 2026-1234 sample A tomography (first proposal scan) |
sample A | 1234 beamtime |
Proposal 2026-1234 sample A tomography |
sample A | 1234 beamtime |
Proposal 2026-1234 sample A tomography (with reading logbook) |
sample A · readings | 1234 beamtime · readings |
Proposal 2026-1234 sample A tomography (with beam-trip pause) |
sample A · paused | 1234 beamtime · paused |
Proposal 2026-1234 sample A overnight tomography |
sample A · outage | 1234 beamtime · outage |
Proposal 2026-1234 sample A streaming tomography |
sample A | 1234 beamtime |
Proposal 2026-1234 sample A tomography (with intervention) |
sample A · degraded | 1234 beamtime · degraded |
Proposal 2026-1235 sample B tomography (aborted on hexapod fault) |
sample B · aborted | 1235 beamtime · aborted |
Sample-of-opportunity tomography (planning 1500 projections) |
leftover core | sample-of-opportunity scan |
mosaic tile {0..3} (N=4) |
wide slab | 1236 2x2 mosaic |
continuous-rotation child Run {1..3}/3 (N=3) |
sample A · rotation | 1234 rotation series |
Proposal 2026-1237 low-energy tomography (25 keV) |
iron-bearing core | 1237 multi-energy |
Proposal 2026-1237 high-energy tomography (30 keV) |
iron-bearing core | 1237 multi-energy |
Pending¶
| Run | Subject | Campaign |
|---|---|---|
Operator-decision Aborted Run |
||
| Alignment-chain composed Runs | alignment-chain Coordinated Campaign | |
| Energy-calibration Run | ||
| Vibration-baseline Run |